GridCore 220kV North Transmission Substation
Power GridMeet NERC CIP rules and physically block remote breaker-trip commands for $4,500.
GridCore 220kV North Transmission Substation
ConduitAI reads the files a plant can hand over without letting anyone onto its network: traffic recordings, the firewall log, the switch settings and photos of the equipment cabinet. It then shows how a hacker in the office could reach the plant, and how to stop that with a one-way data diode.
Network engineer? Switch to Engineer detail at the top for every flow, rule and file.